Another week and the bay window tiles are almost done! Just ridge tiles and some leadwork to do on the second bay window then we are good to go!

Plus Eddie has been, and is almost there with the first fix electrics..all socket boxes, and kitchen/utility wiring done now and week 60 will be the last of the downstairs lights. Eek!

Also how many decisions need to be made before first fix! Wow! I mean, it totally makes sense because it’s essentially all your wiring and plumbing so it’s a good job we are organised ha! Such as where the hob’s going…utility layout etc.! As I’ve said before though, it puts us in a great place for second fix..

And I have a whole lot of wires in my dressing room/ensuite…lots of lowlights, downlights…central lights! Plus I’m going with some sort of central unit in here too so decided it would be best to have electrical options in case I decide to go with draw lights..

And another tap delivery, this one is for the downstairs toilet, in antique brass. It’ll work well with the peacock vibe we are going for in there!

The weather has been amazing this week too and so we gave the front a little tidy and got some nice shots with the safety fence down…isn’t she looking pretty, aside from the scaffolding!

And that’s it for another week…the plumber should be back in week 60 to finish off the first fix plumbing as we now have waste pipe…finally! And we should be able to insulate and move onto the screed…watch this space!