Week 62 – Site Progress! Plus floor lights..

Well, week 62 was a pretty quiet one. Just a little bit of plasterboard..nothing too exciting! This needed doing before the actual plastering as some thinner pieces were required in places…

It is exciting though, having a little bit of plasterboard don’t you think!

Plus woodwork up high to roof level ready for the plasterboards! And also some door frames…

And we also had a delivery of some of the floor lights, and these will be in front of the fireplace, as well as in the hallway and the open plan kitchen. I’m so looking forward to the different light options…as I have probably said numerous times!

The insulation also arrived this week…something we will be helping with once we’ve checked thicknesses with Harold!

2 different thicknesses were delivered (100mm and 200mm) and we’re not sure where each thickness would actually go..watch this space! We’ll be experts by next week! Ha!

And that’s its for week 62, we will be much busier next week! Insulation and underfloor heating as well as removing salt from the brick fireplace and exposed brick!

Stay tuned….

Selfbuilddreamers

Caz and Andy x

Advertisement

Published by Cazandandycoy

Mid thirties couple from Doncaster, UK, embarking on our first self build home in a small village, taking on as much work ourselves as we can

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: