A busy week for us with underfloor installation and touch-up paint jobs!

It looks so much tidier now that the overlay panels are down!! Unlike downstairs in which the underfloor piping was stapled down and a screed applied, the upstairs is somewhat quicker, using the panels and positioning the pipes. All in it took about two days to set it all up. These are the 18mm thick Polypipe Overlay panels and the floor can be fixed directly on top of them.
And I can’t wait to get all the upstairs lights up; that’ll really clear the floor space!


And Andy will be setting up the manifold for the underfloor in week 85…


Plus tile ordering…and how funny is this point of reference image! If you can’t picture the tile size…
Watch this space for more details, namely floor tiles in my ensuite.

Also!!! So so so excited to have booked in all things Crittall! And luckily the fabricator has had a cancellation, and so he can crack on with ours now. Yay! We will be having multiple Crittall doors from a divider to sliding doors, to shower screens. He just needs to measure up and we also need to decide on a finish…watch this space!


And another trip to B & Q…shocker!! This time for tile adhesive and grout…hopefully we’ll be able to crack on with tiling in week 85.

Well that’s it for another week, we should have another busy one coming up. Fingers crossed the electrician can finish off the lights upstairs!!
Selfbuilddreamers
Caz and Andy x