Week 54 – Site Progress! Stud walls, more chipboard and a huge light..

Oh my goodness..the stud walls are going up! And so far we have the utility/downstairs toilet forming eek! Our eagerness took over and we had to make a mini layout beforehand ha! Looks a little bit like a cage at the minute! And the great thing about self building is the numerous tweaking that canContinue reading “Week 54 – Site Progress! Stud walls, more chipboard and a huge light..”

Week 53 – Site Progress..chipboard and the big one…weather tight!

More chipboard this week and it’s been great, actually walking around upstairs and getting a real feel for the space! Plus a little snagging as you can imagine ha! And we are weather tight! Its a temporary door but at least we can now get the ball rolling with the self build mortgage, and theContinue reading “Week 53 – Site Progress..chipboard and the big one…weather tight!”

Double height decisions…

As you may have picked up on in our previous posts, we are keen to really make the hallway/landing a focal point and show off interesting materials and height differences And so, as well as having a central staircase with a concrete stair, wooden treads and a black metal balustrade we have decided to stopContinue reading “Double height decisions…”

Week 51 – Site Progress! Garage door, more deliveries plus decisions…

Yesssss we have a garage door! And it’s certainly a statement piece don’t you think! It is ocean blue ral 5020…the camera seems to darken the colour but you get the idea And this one is an insulated sectional remote control door…perfect for when we’re taking the dogs for walkies via the garage right! AndContinue reading “Week 51 – Site Progress! Garage door, more deliveries plus decisions…”

Week 49 – Site Progress..Bay windows plus fence DIY!

Another week and we now have bay windows yay! We are edging ever closer to being weather tight! Just waiting on the front door, unfortunately there’s a two week delay but hey ho. Not too long now So very excited for the peacock front door knocker! I also can’t wait to take the safety fenceContinue reading “Week 49 – Site Progress..Bay windows plus fence DIY!”

Week 48 – Site Progress! We have windows AND bifolds!

What an exciting milestone this week! After a ten week wait, the windows arrived yay. As you can imagine, we were very excited. And all of them are in now, with the exception of the bay windows..it will be week 49 for those and then the tiling can begin We are so very close toContinue reading “Week 48 – Site Progress! We have windows AND bifolds!”

Ensuite plans!

For the most part, I have pretty much decided both layout and colours for my ensuite…yay go me ha ha! I’ve been keen to incorporate a touch of terrazzo in the design and love this one from Terrazzo tiles I was originally going to go for a white patterned terrazzo but I’ve decided to goContinue reading “Ensuite plans!”

Week 44 – Site Progress plus more lights!

Not a whole lot going on this week, we were hopeful that the garage door would be fitted but that wasn’t to be….well not entirely anyway! The fitters set it up however the company had measured incorrectly by around 300mm and so either the whole door will need to be made again or another panelContinue reading “Week 44 – Site Progress plus more lights!”

Week 42 and 43 – Site Progress!

Another two weeks have gone by, and it shouldn’t be long now until we are water tight eek! Not alot to report in week 42, just the porch tiles and a bit of woodwork on the garage… Plus a site tidy, well the front half of the house, lots of sweeping up so that weContinue reading “Week 42 and 43 – Site Progress!”

Week 41 – Site Progress! Plus more light deliveries and front door changes

Another week has gone by and saw the roof trusses go up ready for the porch tiles Andy set up the scaffolding ready…luckily we didn’t have to wait for the scaffolders to do this ha ha! Thankfully the salt has started to wash off the bricks..phew! It looks here as though they’ve been spray paintedContinue reading “Week 41 – Site Progress! Plus more light deliveries and front door changes”