Week 30 and 31 – Site Progress!

Not a great deal going on over the Christmas period, aside from a little more roof work on Christmas eve, and then a wait for the last of the bricks so that the gables can be finished Finally arriving in week 30, plus the ogee roof guttering came… And other than that a quiet oneContinue reading “Week 30 and 31 – Site Progress!”

Week 28 and 29 – Site Progress!

Oh the saga of waiting on materials! In this case, bricks. And the difficulty being able to pin people down for dates as well. Hopefully they will be arriving in week 30 so that the gables can be finished fingers crossed! However, at least the central section of the roof trusses have been done, andContinue reading “Week 28 and 29 – Site Progress!”

Flooring decided..

We were so undecided as to what to have in the open plan kitchen area at the back of the house for the longest time. The hallway, living room and snug at the front were a no brainer, hardwood parquet. We actually had this in our old house and loved it! So beautiful and lowContinue reading “Flooring decided..”

Kitchen plans…

Very excited to have a kitchen design on paper,and it looks fabulous! Always a bonus! Originally we were going to go with something super modern, with an industrial twist. Handleless, with Copper and Slate cupboard doors but after lots of consideration we felt that we probably would want to change it in a few years,Continue reading “Kitchen plans…”

The stairs are ordered!

So excited! It really feels like a big milestone when you are almost ready to have the stairs installed eek. If you haven’t seen our past instagram posts we are going for a precast concrete central staircase. And so the stairs will be made off site and then craned into place We have now signedContinue reading “The stairs are ordered!”

Week 19 – Site Progress!

More brickwork this week ready for the scaffolding to be moved up again! The front of the house is really starting to take shape now All very exciting. Plus we have also been making decisions regarding sliding doors (last blog post) and are pretty much ready to order the stairs yay! Looking back at theContinue reading “Week 19 – Site Progress!”

Week 15 – Site Progress!

There hasn’t been a great deal going on this week, as we are waiting for the scaffolding…Still waiting as I write this! And so the brickies have been able to pretty much complete the bay windows brickwork and are now up to first floor height! Fingers crossed the scaffolding will arrive early next week soContinue reading “Week 15 – Site Progress!”

Ode to the peacocks..

If you have read any of our blog posts or seen our Instagram you will know that there are lots of peacocks wandering around our village. It is famous for them in our town! And so its only right that we have a peacock room in our new house right?! And so we are thinkingContinue reading “Ode to the peacocks..”

Week 12 – Site Progress! Plus the first 3 months timelapse!!

More blockwork this week, going up to first floor level, it is deceptively high! Our ceiling height is 2.415 which is a little higher than standard but still…and obviously the floor levels will differ to now, it does feel high though! And I’m not complaining Love love love our exposed brick wall! We are soContinue reading “Week 12 – Site Progress! Plus the first 3 months timelapse!!”

Wren kitchen design!

We have decided to go with wren for our kitchen and utility design. They have a beautiful milano elements range with cupboard doors that are exactly what we are looking for… Left to right Copper, Slate and Bronze all matt Yes we are going to use all three..as we are having an island as well,Continue reading “Wren kitchen design!”