Week 60 – Site Progress! First fix is almost finished plus window cills and using the bifolds..

Another week and the first fix is just about done…honestly ha! The waste pipes are now in but the plumber is missing a few bits and so hopefully he will be back in week 61…. Plus Harold has been busy with bay window cills and has almost finished the roof tiles too..just ridge tiles toContinue reading “Week 60 – Site Progress! First fix is almost finished plus window cills and using the bifolds..”

Week 57 – Site Progress..we have wires! Plus door casings,and great finds!

Busy week this week, Eddie the electrician…official name ha (!) has been on site most of the week and has pretty much done all the first fix electrics upstairs Wires..wires everywhere! And lots of them in the cinema room…we will be having twinkly LED spotlights in here… As you can see, very sparkly and we’veContinue reading “Week 57 – Site Progress..we have wires! Plus door casings,and great finds!”

Acoustic panelling..

As we are underway with the stud walls, and rooms are starting to take shape, we can give a little more thought to the hidden door in the tiki bar! If you have seen on our Instagram, we will be having a coat cupboard in this room,and as it is just off from the hallwayContinue reading “Acoustic panelling..”

Week 56 – Site Progress..first fix electrics and more stud walls

More progress this week! Andy has been assigned some plumbing tasks and so he made a start on those…cue plumbing related items laid out all pretty in the house ha ha! And he invested in a new drill, and special drill bit making drilling the plumbing holes much easier! Needless to say he’s very happyContinue reading “Week 56 – Site Progress..first fix electrics and more stud walls”

Week 55 – Site Progress..another stud wall plus ready for first fix!

A pretty quiet one but we do have another stud wall and the first fix on the horizon! This one is the Jack and Jill ensuite upstairs for the guest bedroom and cinema room It’s pretty cool being able to play around with room sizes. In this case we made the window central to theContinue reading “Week 55 – Site Progress..another stud wall plus ready for first fix!”

What a difference a year makes…

It seems only yesterday that we were getting giddy about the digger ha! And look has us now..almost weather tight and onto the interiors Cue digger pic… There has been the odd delay on the way, be it materials..or waiting for scaffolding (bug bear of mine) or measuring issues (!) but we are getting thereContinue reading “What a difference a year makes…”

Double height decisions…

As you may have picked up on in our previous posts, we are keen to really make the hallway/landing a focal point and show off interesting materials and height differences And so, as well as having a central staircase with a concrete stair, wooden treads and a black metal balustrade we have decided to stopContinue reading “Double height decisions…”

Week 49 – Site Progress..Bay windows plus fence DIY!

Another week and we now have bay windows yay! We are edging ever closer to being weather tight! Just waiting on the front door, unfortunately there’s a two week delay but hey ho. Not too long now So very excited for the peacock front door knocker! I also can’t wait to take the safety fenceContinue reading “Week 49 – Site Progress..Bay windows plus fence DIY!”

Ensuite plans!

For the most part, I have pretty much decided both layout and colours for my ensuite…yay go me ha ha! I’ve been keen to incorporate a touch of terrazzo in the design and love this one from Terrazzo tiles I was originally going to go for a white patterned terrazzo but I’ve decided to goContinue reading “Ensuite plans!”

Kitchen island light?

If you have read some of our previous posts, you will know that we decided to go with a lighting designer…check it out here And one of the suggestions was to go with something quite simple above the kitchen island…side note in light of this (excuse the pun!) we are going a little crazy aboveContinue reading “Kitchen island light?”