Something I’ve been SO excited to put together, is my dressing room! Who wouldn’t?! And I decided to go with the Ikea PAX system. If you’re not familiar with this, it is a modular system, with lots of different internal options, and can be designed to suit your requirements. It can be a lot ofContinue reading “Ikea hack! The PAX system…”
Tag Archives: newhome
We’ve moved in!
Okay, so it’s been some time since I last blogged! We’ve had some ups and down since March, and this has been put on the back foot, as they say… And, as you can imagine, lots of house things have been going on since, and we’ve now moved in! Yay! Still a long to doContinue reading “We’ve moved in!”
House shenanigans update!
Well..there’s been lots of bits and pieces going on in the last few weeks from kitchen layout to digging to the odd purchase! And Andys laid out the kitchen island and fitted the doors now, wow these look fab from Naked Kitchens Plus the kitchen layout is pretty much in place…watch this space for more…andContinue reading “House shenanigans update!”
Week 87 – We have a kitchen!
Yaassssss! We do indeed have a kitchen and utility! Woop! Andy picked them up on Friday and what a road trip. A 5 hour round trip in total, but it’s all home now and ready for fitting! And definitely one to start in week 88! It’s really filled the back room. I didn’t think we’dContinue reading “Week 87 – We have a kitchen!”
Week 85 – Tiling DIY! Plus more decision making…
More DIY-ING this week, and this time in the form of tiling! But first, some more decisions with regards to the stairs and, more importantly, the detailing! Having decided to go with a black metal balustrade, we were still a little up in the air as to how it should be fixed to the stairs.Continue reading “Week 85 – Tiling DIY! Plus more decision making…”
Week 84 – More underfloor..this time upstairs!
A busy week for us with underfloor installation and touch-up paint jobs! It looks so much tidier now that the overlay panels are down!! Unlike downstairs in which the underfloor piping was stapled down and a screed applied, the upstairs is somewhat quicker, using the panels and positioning the pipes. All in it took aboutContinue reading “Week 84 – More underfloor..this time upstairs!”
Week 81 and 82 – Happy Christmas!
Well, we certainly had a busy couple of weeks with flooring and lights! Eddie, the electrician, set up some of the circuits, and as I drove up to the house from work, it was so strange seeing light and so exciting!! Plus we have been able to take the scaffolding down, now that updown lightsContinue reading “Week 81 and 82 – Happy Christmas!”
Weeks 78 and 79 – More flooring plus guest bedroom architrave!
Week 78 was a little quiet, given that the electrician has been held up on other jobs. So, just some more flooring and light deliveries! These ones were out of stock for a while, but luckily, they were available again, phew! And they are the plaster lights mentioned in previous posts..we had only ordered oneContinue reading “Weeks 78 and 79 – More flooring plus guest bedroom architrave!”
Week 77..we have a floor!!
Another week and the first of the flooring has been laid, in the soon to be tiki bar! We decided to measure from the centre of the house, as the same floor will run through the whole of the ground floor. And as luck would have it, our house is so symmetrical, the herringbone patternContinue reading “Week 77..we have a floor!!”
Weeks 75 and 76 – Lots of flooring plus more painting and the first of the lights!
Lots more painting this last couple of weeks! We are almost there now, I’m so over painting ha! It’s just so messy, I can’t wait to have a good old sweep up and a tidy..and put away the paint brushes…and the sprayer! We actually did the walls of my dressing room and our bedroom withContinue reading “Weeks 75 and 76 – Lots of flooring plus more painting and the first of the lights!”